国产剧情AV麻豆香蕉精品,国产女人A级毛片18视频,人妻丰满熟人熟妇av无码,久久99国产精品9床震网站

          Language:CHINESESENGLISH

          Home > News > Installation point supported glass curtain wall supporting structural members shall comply with the requirements of
          CONTACT US
          • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
          • Phone:0757-81002668/0757-63323396
          • Fax:0757-81196682
          • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
          • E-mail:sbs@sbsprefabhouse.com
          • URL:http://www.creadir.com

          Installation point supported glass curtain wall supporting structural members shall comply with the requirements of

          Time:[2014-6-18]  Hits:4438

          Device point supported glass curtain wall supporting structural members shall comply with the following requirements:
          1, Foshan steel device during system holes, assembly, welding and painting processes should comply with "steel construction and acceptance criteria" of the relevant provisions of GB50205;
          2, a large steel structure should be hanging point plan and examination hanging;
          3, steel unit in place, tighten the adjustment should be timely and reporting concealed work;
          4, the steel components in the transport, storage and equipment damaged during coating and uncoated device convergence site,
          5, must be applied to pre-tension the steel rod and steel cable devices. Optional pre-tension dynamometer measurement should be consistent with the planning requirements. Should set the pre-tension adjustment.
          Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號