国产剧情AV麻豆香蕉精品,国产女人A级毛片18视频,人妻丰满熟人熟妇av无码,久久99国产精品9床震网站

          Language:CHINESESENGLISH

          Home > News > Steel General Setup
          CONTACT US
          • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
          • Phone:0757-81002668/0757-63323396
          • Fax:0757-81196682
          • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
          • E-mail:sbs@sbsprefabhouse.com
          • URL:http://www.creadir.com

          Steel General Setup

          Time:[2014-7-12]  Hits:4757

          Steel usually means the program is:
          Foshan Steel components View-based review beam steel columns supporting device device device platform plate (laminates, roof) device maintenance structure of the device.
          For example:
          - A multi-storey car factory paint shop program for the steel plant equipment:
          View the basis of the review and the bottom component processing device between the steel columns supporting device main beam column secondary beam device device device cap plate steel roof purlins device device horizontal, vertical roof support device device device wall plates.
          Another example:
          - Bolt ball grid node device altitude bulk Act procedures:
          Capitals elevation retest movable scaffolding platform erection drawings by planning to put line on the platform by means of ingredients to order six sets of rods mounted on the center line of the device grid transition plate, bearing device chord truss rod balls and equipment abdominal wound ball and rod means chord sequence to the first axis by axis grid cell to start the first device to complete the first ax
          Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號