国产剧情AV麻豆香蕉精品,国产女人A级毛片18视频,人妻丰满熟人熟妇av无码,久久99国产精品9床震网站

          Language:CHINESESENGLISH

          Home > News > Multi-storey and high-rise steel column base grouting requirements
          CONTACT US
          • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
          • Phone:0757-81002668/0757-63323396
          • Fax:0757-81196682
          • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
          • E-mail:sbs@sbsprefabhouse.com
          • URL:http://www.creadir.com

          Multi-storey and high-rise steel column base grouting requirements

          Time:[2014-8-27]  Hits:4585

          Multi-storey and high-rise steel column base grouting requirements

          [Student] multi doubt rise steel column base grouting and regulations?
          [Answer] In the first section of the frame after installation, calibration, bolt, that should be the bottom end of the steel column column grouting, grouting way is to stand around in the column foot template, based on a clean surface to clear, and then polymerized with high strength mortar poured from the Liberal side to dense, after filling with wet straw bags or sacks conservation.
          Above all finishing work according to the participants encountered in actual questions from, for reference, if in doubt please timely communication, correct me. Foshan Steel

          Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)