国产剧情AV麻豆香蕉精品,国产女人A级毛片18视频,人妻丰满熟人熟妇av无码,久久99国产精品9床震网站

          Language:CHINESESENGLISH

          Home > News > Guangzhou Steel teach you: hoisting steel construction zone safety of the general provisions
          CONTACT US
          • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
          • Phone:0757-81002668/0757-63323396
          • Fax:0757-81196682
          • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
          • E-mail:sbs@sbsprefabhouse.com
          • URL:http://www.creadir.com

          Guangzhou Steel teach you: hoisting steel construction zone safety of the general provisions

          Time:[2015-7-29]  Hits:4773

          Guangzhou Steel teach you: hoisting steel construction zone safety of the general provisions


          1, lifting the region should set the security cordon, non-staff prohibited from entering.
          2, lifting objects hanging from the ground 200mm ~ 300mm, should conduct a comprehensive inspection, and should officially lifted after confirmation.
          3, when the wind speed reaches the 10m / s, should stop lifting work; when the wind speed reaches the 15m / s, shall lifting work.
          4, high-altitude work using small hand tools and small parts should be taken to prevent the fall approaches.
          5, the construction of electricity should be consistent with the current industry standard "construction site temporary electrical safety specifications" JGJ 46 of the relevant provisions.
          6, the construction site should be professional personnel to install, maintain and handle electrical equipment and power lines.
          7, every day hanging member when finished floor or roof is not installed on to, to be taken and reliable way for temporary fixing.
          8, the pressure plate surface water, ice, frost or snow, should be promp

          Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號