国产剧情AV麻豆香蕉精品,国产女人A级毛片18视频,人妻丰满熟人熟妇av无码,久久99国产精品9床震网站

          Language:CHINESESENGLISH

          Home > News > Guangzhou Steel tells you: architecture and layout of a single-layer steel plant
          CONTACT US
          • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
          • Phone:0757-81002668/0757-63323396
          • Fax:0757-81196682
          • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
          • E-mail:sbs@sbsprefabhouse.com
          • URL:http://www.creadir.com

          Guangzhou Steel tells you: architecture and layout of a single-layer steel plant

          Time:[2015-8-22]  Hits:4103

          Guangzhou Steel tells you: architecture and layout of a single-layer steel plant


          Lateral lateral force resisting system of a single steel plant, the use of capitals steel roof beams and frame connected or hinged portal frame, cantilevered pillar or other architecture. Plant longitudinal lateral force resisting system should be adopted between the column support frame structures may also be used when conditions.
          2 steel skeleton of the maximum stress zone may occur during an earthquake plastic hinges, resulting in the loss of the whole members and local stability, it could produce plastic hinge member at maximum stress area should prevent welding head; for the greater thickness can not use bolt convergence member, can be butt welded joints of equal strength convergence.
          3 hinged roof beams with the capitals, with bolts convergence. When the beam is solid web beams, in order to ensure the convergence node has sufficient carrying capacity to ensure node and link succumb when damage does not occur in the whole cross section of members, cohesion beams and columns and beams and beam splice flexural, shear ultimate bearing force, should be able to withstand the beam respectively when the whole Flexual succumb, shear capacity by 1.2 times.
          4-column support rod should adopt the entire root data, can be butt welded joints and other strong stitching data exceeds the maximum length specifications; cohesion and inter-column support member, should not be less than the support rod plastic carrying capacity 1.2 times. Guangzhou Steel

          Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號