国产剧情AV麻豆香蕉精品,国产女人A级毛片18视频,人妻丰满熟人熟妇av无码,久久99国产精品9床震网站

          Language:CHINESESENGLISH

          Home > News > Guangzhou Steel News: light steel portal frame roof drainage
          CONTACT US
          • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
          • Phone:0757-81002668/0757-63323396
          • Fax:0757-81196682
          • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
          • E-mail:sbs@sbsprefabhouse.com
          • URL:http://www.creadir.com

          Guangzhou Steel News: light steel portal frame roof drainage

          Time:[2015-9-2]  Hits:4585

          Guangzhou Steel News: light steel portal frame roof drainage


          Light steel plant due to poor drainage and overflow gutter to the interior, the situation is affecting the normal use of occasional attacks, analyze the main reason is not rational design. On the concrete roof, within days of the ditch water rose to the roof, generally do not appear leakage problems, so "building water supply and drainage design specifications" (GB50015-2003) provision storm sewer design return period of only one year, standpipe drain endless rain, allowing innings gutter drain from the plant through the roof gable safety overflow.
          The light steel plant roof and gutters are fabricated steel components, slab sealing function is far less than concrete roof, so in the design of roof drainage should not apply the traditional concept of the concrete roof drainage, such as the roof area per 200m to set up a root rainwater pipe. Guangzhou Steel

          Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號