国产剧情AV麻豆香蕉精品,国产女人A级毛片18视频,人妻丰满熟人熟妇av无码,久久99国产精品9床震网站

          Language:CHINESESENGLISH

          Home > News > End construction steel construction is now beginning Tianhe Airport
          CONTACT US
          • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
          • Phone:0757-81002668/0757-63323396
          • Fax:0757-81196682
          • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
          • E-mail:sbs@sbsprefabhouse.com
          • URL:http://www.creadir.com

          End construction steel construction is now beginning Tianhe Airport

          Time:[2015-12-2]  Hits:4435

          End construction steel construction is now beginning Tianhe Airport "Coronet" prototype

          Tianhe Airport outside New aviation tower construction of three projects pick end construction steel structure. Tianhe Airport T3 shape design the shape of the Phoenix, the current "phoenix body" summarizes the main building can still be seen; "Coronet" tower has already been felt throughout the Phoenix beginning to appear. Guangzhou Steel

          New air traffic control tower was constructed of concrete cylinder, an outer cantilever steel structure modeling, structural steel are all high-altitude cantilevered construction work, construction difficulty, high safety control requirements. To ensure the smooth completion of the tower within the prescribed time, the project developed a detailed construction plan, strengthening process control, to ensure safe and orderly works fast forward. So far, the tower has ended for all steel columns, steel beams lifting work inside the tower tube well integrated pipeline, fire standpipe, rainwater pipes, installation of air tubes and valves, equipment, towers underground pipe have all been completed. Annexe tower renovation work launched simultaneously, has been the end of the floor of the concrete pouring into the masonry masonry stage.
          New tower project is a special three projects supporting the project Tianhe Airport, the aviation command and control center belong to the airport, aircraft movements control hub, directly related to the T3 terminal can officially put into operation, the Wuhan build Chubu International Airport, Sprint National Airlines "fourth city" landmark historical significance. Tower tower project is divided into two parts air traffic control, covering a total area of ​​about 220 acres and a building height of 115 meters, is China's first, world's second tower, far-reaching significance for the Chinese Civil Aviation Authority, which will become the central hub - Wuhan Tianhe International Airport landmarks. Guangzhou Ste

          Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號