国产剧情AV麻豆香蕉精品,国产女人A级毛片18视频,人妻丰满熟人熟妇av无码,久久99国产精品9床震网站

          Language:CHINESESENGLISH

          Home > News > China's steel at the end of
          CONTACT US
          • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
          • Phone:0757-81002668/0757-63323396
          • Fax:0757-81196682
          • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
          • E-mail:sbs@sbsprefabhouse.com
          • URL:http://www.creadir.com

          China's steel at the end of

          Time:[2016-1-30]  Hits:4061

          Guangzhou Steel News: China's steel at the end of "Thirteen Five" expected to enter "Billion" Time

          Guangzhou Steel News: Although the steel industry is now in the "frozen period" struggling, but reporters from the 2016 China Steel Development Forum held January 26 informed that in 2015, China's steel production of about 50 million tons to achieve the goal of doubling the "five" proposed; "thirteen five" is expected to double again by 2020 to more than 100 million tons.
          According to experts, the "five-second" period, the proportion of China's steel steel steel production accounts for 5% to 6%, and in the towers, residential buildings and small and medium span bridges, the proportion of non-steel to 1%, far below the level of developed countries. Therefore, development of steel industry in our country huge space.
          The forum proposed "Thirteen Five" China's steel industry overall roadmap and objectives of strengthening the supply side of the steel structural reforms, persist in innovation-driven, efforts to resolve the bottleneck restricting the development of the steel structure, promote the rapid development of steel construction and strive to achieve "thirteen five" period sTEEL amount exceeds 15% annual growth, rapid and healthy development, by 2020 more than 100 million tons.
          At the same time, the Forum for the development of the steel structure put forward specific measures and recommendations: First, to strengthen top-level design and layout strategy, leading and exemplary role of the government role to cultivate steel market, increase policy support and strengthen supervision; second is to improve steel the whole industry chain, industry alliances and support leading enterprises, implementation of steel construction of pilot projects; third is steel related industries "going out"; Fourth, innovation-driven, focus on solving common key technical problems and personnel bottlenecks; Fifth new ideas and to improve the social and market acceptance.
          The experts pointed out that "Thirteen Five" period, the steel structure is widely used in the construction field, to resolve excess capacity, promote industrial restructuring, accelerate the construction of new urbanization can play an important role. November 4, 2015, Chinese Premier Li Keqiang chaired a State Council executive meeting made it clear "The combination of canopy change and seismic and other housing projects, steel construction to carry out the pilot, and expand the use of green building materials", issued from the national level to promote application of steel sound. The next five years, steel will usher in a rare development opportunity.
          21 academicians and more than 60 government leaders in charge, entrepreneurs, experts and scholars gathered in Beijing from the field of construction, steel structure development advice. Chinese Academy of Engineering, Chongqing University president Zhou Xuhong, Chinese Academy of Engineering, Tsinghua University, Professor Nie Jianguo, Chinese Academy of Engineering, Tongji University Professor by Shen Yan, president of China Steel Structure Association, Director of National Steel Engineering Technology Research Center, School of Metallurgical Construction Research Institute long FILLED were at the forum to do a special report. Forum by the China Academy of Civil Engineering, Department of Water Resources and Construction, China Steel Association, the National Steel Engineering Technology Research Center, jointly organized China Metallurgical Construction Research Institute Co., Ltd., Chongqing University, Tsinghua contractors.

          Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號