国产剧情AV麻豆香蕉精品,国产女人A级毛片18视频,人妻丰满熟人熟妇av无码,久久99国产精品9床震网站

          Language:CHINESESENGLISH

          Home > News > Foshan General Steel measuring program
          CONTACT US
          • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
          • Phone:0757-81002668/0757-63323396
          • Fax:0757-81196682
          • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
          • E-mail:sbs@sbsprefabhouse.com
          • URL:http://www.creadir.com

          Foshan General Steel measuring program

          Time:[2016-7-6]  Hits:3889

          As the fundamental Foshan steel construction, during construction only, must be applied with a series of measurements and each process, measurement solutions throughout the entire construction process of steel Foshan, Foshan steel construction preparations key First, through high-precision measurement and calibration accuracy of the installation of the steel member to the specified location to meet the accuracy requirements, therefore, after the preparation, the measurement is the most keywords point below Katsukuni steel to introduce the next General steel measuring program

           

          First, the measurement and control of all construction work Surveying work required to be responsible for the construction and installation of steel structures, Foshan, with supervision engineers test measurements and all auxiliary work conditions

          Second, before the project began, the elevation and coordinate reference point and measuring point provided by the chief engineer, but if you think the information provided by contractors when there are problems, engineers need to think reflect

          Third, after receiving measurement reference point provided by contractors, precision measurement of the measurement reference point to go to school, and to review the accuracy of the information and data reference point, and to be reflected in writing Engineer

          Fourth, the contractors provide a reference point for the word basis, according to national mapping standards and engineering precision requirements, the control center set engineering and engineers to review

          V. baseline, anchor construction, accurate control points and point of construction, after a final measure to detect and measure the positioning point accuracy meets the construction requirements

          Sixth, protect the measurement is completed reference point, the reference lines,

          7. After the installation is complete Foshan steel, at the same time each day to determine whether the measurement Foshan deformed steel node data, corrected if necessary

          Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號